Understand when a site survey, landlord review, permit or professional installation may affect the design, price and schedule.

6 minute guideDiscuss your project →
01

Confirm the property rules

Exterior signs are often shaped by local sign codes, landlord criteria, easements and electrical requirements. Those constraints should be known before a final sign is fabricated.

  • Share the complete project address
  • Provide landlord or tenant sign criteria
  • Identify any historic district or campus standards
  • Confirm who owns the permit application and fees
02

Know when a survey helps

A survey reduces assumptions when dimensions, structure, power, visibility or equipment access cannot be confirmed from reliable drawings and photos.

  • Measure the available sign area
  • Document wall, glass and ground conditions
  • Locate power and existing penetrations
  • Photograph approaches, obstructions and installation access
03

Plan installation with the sign

Mounting hardware, access equipment, traffic control and electrical work can materially change the final scope. Installation should not be treated as an afterthought.

  • Identify mounting height and surface
  • Confirm lift, ladder and vehicle access
  • Plan removal and disposal of existing signs
  • Coordinate electricians or other licensed trades when required
04

Build a realistic schedule

Design, approvals, permits, fabrication, freight and field work are separate steps. Openings and events should be shared at the beginning so the critical path can be managed.

  • Share the required completion date
  • Allow time for landlord and municipal review
  • Avoid scheduling installation before the sign is inspected after delivery
  • Create a temporary-sign contingency when timing is fixed
05Helpful answers

Questions before you begin.

Does every sign need a permit?

No. Requirements depend on the jurisdiction, sign type, size, lighting, placement and property. Exterior and illuminated signs are more likely to require review.

Can Full Circle coordinate the permit?

Permit coordination can be included when the project and jurisdiction support it. The property owner or licensed local professional may still need to provide documents or signatures.

Can installation be quoted from photos?

Simple work sometimes can. Complex elevations, unknown walls, electrical signs and freestanding structures commonly need more site information or a survey.